If you re unsure about yours remove a tile and send it to a local asbestos abatement firm for testing.
Do you have to seal a concrete floor before tiling.
Most floor tiles made from the 1920s to the 1960s contain asbestos and require special procedures for removal.
New concrete floors or screeded floors are a different matter.
Warning never lay tile over a damaged concrete floor without repairing it or your.
Seal off the area with poly sheeting.
These membranes prevent water from seeping up.
Deciding whether to seal the concrete is part of the preparation.
If it tests positive follow these asbestos abatement procedures.
Priming new concrete floors.
Dirt plaster adhesive and all manners of stuff will be ground into it before the tiler gets round to tiling it.
This is particularly imported when laying tile as the floor needs to be as level as possible.
Also ensure that the concrete is level.
A concrete slab makes a good surface on which to lay tile.
Lay down a sheet of crack isolation membrane before tiling if your concrete floor is severely damaged or aged.
The following steps will allow you to prepare a concrete floor before you lay your tiles.
The concrete makes a firm surface that the tile requires.
You will have to clean and prepare the concrete surface before installing any tile.
Use filler to fill in any dips and apply a floor leveler for any humps in the floor.
You can either roll on a liquid latex membrane or use a peel and stick crack prevention mat over the entire concrete subfloor.
Roughening the surface is needed for the sealer to stick properly to the concrete.
Dont forget to seal the floor with pva before applying any tile adhesive and use a good quality adhesive for your.
Jul 5 2010 1.
So your nice new clean ply floor isn t so clean anymore and if it s not prepared properly prior to tiling the adhesive will just go onto the dirt on the floor and might not stick.
Step 3 mix.
For that reason it is best to use an elastomeric crack prevention membrane to both seal the floor and protect your tile installation from failure.
Cleaning and filling any cracks in the floor takes a little time and the only precautions to take prior to tiling are to make sure that the floor is completely dry as the thinset used for tile needs a moisture free environment.
This is why it is better to prime it than not to.
Use reputable flexible adhesive for tiling on screeds and concrete and as per the manufacturers specifications do not use pva but a latex based primer if the concrete surface is shedding dusty fine particles after drying.